American Cleanroom Systems was contracted to build and install new manufacturing and engineering cleanrooms for a global avionics company, with start to finish installation in 6 months. Special requirements included ESD cleanroom, special security walls, and an equipment platform for storage. American Cleanroom Systems designed, furnished, and installed the cleanroom with static dissipative aluminum on aluminum cleanroom modular walls, 125 PSF mezzanine, ADA air shower, and static dissipative heat welded vinyl flooring HEPA filtration on schedule.
Cotizaciones en 48 horas. Llame o complete el formulario de solicitud de presupuesto en línea.
American Cleanroom Systems® 2024 - Unauthorized use and/or duplication of this material without express and written permission from this website owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to American Cleanrooms with appropriate and specific direction to the original content.